top of page
search

0

SEARCH

42 results found with an empty search

  • 内装床タイル(セメント二次製品)施工方法 - 【建材メーカー】キャン’エンタープライゼズ

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > 内装床タイル(セメント二次製品)施工方法 > MANUAL Interior floor tile (secondary cement product) installation method Download PDF > This is the installation method for interior floor tiles (secondary cement products). Applicable substrate: Plywood (There are various methods for installing interior floors, but we will introduce the method using interior floor adhesive.) 1. Surface preparation Applicable base: Plywood (There are various installation methods for interior floors, but here we will introduce the installation method using interior floor adhesive. 2. Paste Arrange the tiles temporarily and then install them while making sure to minimize unevenness. Apply interior floor adhesive to the base and the back of the tile and press firmly. Be careful not to create any cavities on the back side. Check the area being worked on during the process, and if there are any large uneven areas, remove the product and apply interior floor adhesive to the back of the product to adjust the unevenness as you work. After installation, check that the unevenness has been adjusted. 3. Jointing Fill the joints with mortar. Fill the joints up to the surface of the product (to prevent tripping). Wipe off any grout stains on the surface with a sponge that has been soaked in water and wrung out. The stains will become harder to remove over time. After completion, inspect the area and refill any gaps that are not completely filled. 4.Curing Be sure to cover the area thoroughly with a sheet or similar. Do not stand on or place objects on the construction area during construction. *It will take about a week to cure until the final hardening. Please try to keep the area as well ventilated as possible until hardening is complete. 5. Cleaning After completing the preparation, thoroughly brush off any dust from the product surface and joints. ◎As this is a secondary cement product, acid washing is strictly prohibited. < Back to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • アクセス - 【建材メーカー】キャン'エンタープライゼズ

    弊社1Fのショールームでは、自社工場で生産したキャン’ブリックやキャン’ストーン、輸入床タイルや照明を展示しています。 お電話、お問い合わせフォームにてご予約の上お越し下さい。Zoomを利用したTV会議でのお打ち合わせも可能です。お気軽にご相談ください。 Top > Access > ACCESS Access Information Can'Enterprises Inc. 〒211-0025 SJ Building 2F, 4-28-3 Kizuki, Nakahara-ku, Kawasaki City, Kanagawa Prefecture TEL: 044-433-5001 / FAX: 044-433-5009 By train 10 minutes walk from Motosumiyoshi Station on the Tokyu Toyoko Line By car "Kizuki 4-chome" at the intersection of Tsunashima-kaido and the Shirite-Kurokawa Line. This is a brick building along Tsunashima-kaido. Please feel free to use the parking spaces available near the building on the premises. SHOWROOM showroom For those who make reservations by phone 📞 044-433-5001 Business hours: 9:00~18:00 Closed on Saturdays, Sundays, national holidays, summer holidays, and winter holidays CONTACT In our showroom on the first floor, we display Can'brick and Can'stone produced in our own factory, as well as imported floor tiles and lighting. Please make a reservation by phone or through our inquiry form before coming. We can also hold a video conference using Zoom. Please feel free to contact us. CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • CAN’BRICK内壁施工方法 (MT-BOND 接着剤張り工法) | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > CAN’BRICK内壁施工方法 (MT-BOND 接着剤張り工法) > MANUAL CAN'BRICK inner wall construction method (MT-BOND adhesive tension method) Download PDF > This is the interior wall construction method for the brick tile "CAN'BRICK" (MT-BOND adhesive laying method). Applicable substrates: gypsum board (plasterboard) / calcium silicate board / structural plywood / mortar substrate *Areas not exposed to water 1. Surface preparation Clean the base surface. Check that the base is firmly fixed and that there are no unevenness in the joints of the boards, etc. 2. Applying adhesive Apply the special interior wall adhesive (MT-BOND) to the base using a trowel with teeth of about 6 to 7 mm, squeezing it in, then close off the teeth to adjust the thickness to about 3 to 5 mm. The area to be painted at one time should be the area where the bricks will be laid within approximately 40 minutes of open time, or within 1 MAIKO KANNO². 3. Attachment (Improved Pressure Bonding Method) The back of the brick is slightly uneven, so apply MT-BOND to the extent that the legs (octopus legs) of the brick are no longer visible. Attach the brick by kneading it, and press MT-BOND fully into the joints so that it fits the entire back of the brick until it overflows. ※point※ ◎To check the adhesion of the special interior wall adhesive (MT-BOND), peel off several sheets every 2 m2 and work while checking that the special interior wall adhesive (MT-BOND) is attached to at least 70% of the back side. If the effective adhesion area is 70% or less, use an 8 mm comb trowel to increase the amount of special interior wall adhesive (MT-BOND) applied to the base or increase the amount of special interior wall adhesive (MT-BOND) applied to the back side of the brick. 4. Joint finishing Use a slightly damp brush to smooth out any excess joints to give them a natural look. ※point※ If there is not enough adhesive in the joints, it may cause peeling. 5.Curing Avoid direct sunlight and protect the product with a sheet or similar. Allow sufficient time for the adhesive to harden. 6. Joint finishing Fill the joints with the special joint material MT-MEJI using a joint bag, etc. After filling, roughly press down with a joint trowel. Check that it covers at least 1/2 the thickness of the brick and your desired finish (see joint finish), and fill in any gaps with a joint bag, etc. ※point※ Don't worry if the trowel leaves uneven marks, just finish the job, and finally use a brush or scissors to scratch the joints in places to make them look weathered. *For exteriors or areas exposed to water, please refer to the sections on elastic adhesive installation or wet installation. < Back to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • CAN’STONE外壁施工方法 (在来型湿式工法) | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > CAN’STONE外壁施工方法 (在来型湿式工法) > MANUAL CAN'STONE exterior wall construction method (conventional wet method) Download PDF > This is an exterior wall construction method (conventional wet construction method) for the stone-style wall material "CAN'STONE". Applicable substrate: Concrete block, lath mortar 1. Surface preparation A. In the case of concrete, block, or raspberry base... After inspecting and cleaning the base, apply an adhesive enhancer (such as Tilement EV-300) with a roller. In the case of a rasmol base, allow sufficient curing time to ensure that it is completely dry and has minimal unevenness before applying the adhesive enhancer. B. In the case of wooden base... Apply waterproof paper and use it as a mortar base, or create a mortar base on top of a mortar board. After allowing sufficient time for curing, carry out the same work as in (a). ※point※ ◎ Avoid carrying out installation in rainy weather and carry out on a sunny day. ◎ When carrying out work during cold seasons, do not carry out work when the temperature is below 5°C or if it is expected that the temperature will drop below 5°C during the curing period after work. 2. Preparation for pasting Remove the stones from the multiple cartons and place them temporarily in the work area. Create an overall image and paste it in. 3. Applying mortar Apply resin mortar (recommended: Nippon Kasei NS-ST mortar) to the base, squeezing it in, then apply two coats to adjust the thickness to about 5mm. The area you apply at one time should be limited to the area where you will finish laying the stones within the open time (working time) of 30 minutes. ※point※ The open time varies depending on the season, temperature, and other conditions. If you touch the resin mortar applied to the base with your hand and it does not stick to your hand, the open time is too long. Check as you work and shorten the open time according to the situation. 4. Installation (Improved crimping method + Vibration tool) 1. After cleaning the back of the stone with a brush, apply about 5mm of resin mortar evenly to the entire back of the stone, then attach it to the wall. The back of the stone is uneven, so make sure that the mortar is applied firmly to the entire back. Use a vibrating tool to press the resin mortar firmly into the joints until it overflows. 2. If the area you are installing has a corner, start attaching the pieces from the corner. The corner pieces have long and short sides, so attach them alternately. 3. When attaching the flat pieces, first proceed by fitting the larger stones in place. ※point※ ◎CAN'STONE has a low water absorption rate, so there is no need to soak the stone in water or apply a primer to the back of the stone before application, which were precautions when applying conventional cement-based stone. However, this does not apply to the base, so the base must be prepared according to the conditions. ◎ Installation should be done using the improved pressure-attaching method and a vibrating tool should be used. ◎To check the adhesive adhesion during installation, peel off several pieces every 2m2 and check whether the resin mortar is attached to the entire back side. If there is not enough mortar on the back side, recheck and adjust the thickness of the coating on the base, or increase the amount of resin mortar applied to the back side of the stone. 5. Processing (dimension adjustment) Please adjust the size of the stones to ensure a good fit. Use a diamond cutter, hatchet, pliers, etc. to cut, mill, or separate the material in the areas that are as thin as possible. 6. Joint Finishing 1. Fill the joints with our joint material MT-MEJI using a joint bag etc. In particular, in areas where the joints do not rise much when pasting, fill the joints sufficiently to about 1/2 or evenly. 2. To finish the joints, press the filled MT-MEJI firmly with a joint trowel before it hardens, then use a brush or whisk to roughly scratch the joints. ※point※ Don't worry if the trowel leaves uneven marks, just finish the job, and finally use a brush or scissors to scratch the joints in places to make them look weathered. ◎Do not install without joints. 7. Curing and water absorption prevention treatment Avoid ventilation and direct sunlight, and protect the surface by covering it with a sheet or similar. Allow sufficient time for curing after application, and ensure that it is completely dry. Then thoroughly brush away any dust on the stone surface and in the joints. Then, apply REPEL-S, a penetrating water absorption inhibitor, using a sprayer, brush, roller, etc. ◎Since CAN'STONE is a secondary cement product, acid washing is strictly prohibited. < Back to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • CAN’STONE内壁施工方法 (接着剤張り工法) | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > CAN’STONE内壁施工方法 (接着剤張り工法) > MANUAL CAN'STONE interior wall construction method (adhesive application method) Download PDF > This is an interior wall construction method (adhesive application method) for the masonry-style wall material "CAN'STONE." Applicable substrate: calcium silicate board (specific gravity 1.0) (excluding gypsum board), structural plywood, mortar substrate *For areas that will not be exposed to water, please use stone application adhesive (recommended: Can'Stone Adhesive MS-20 for interior wall imitation stone tiles). Check the application method of the adhesive for suitable substrates. *Recommended base: Calcium silicate plate, 8mm thick or more (specific gravity 1.0) Flexible board 8mm thick or more Plywood 12mm thick or more 1. Surface preparation A. In the case of a mortar base... Inspect and clean the base. For Rathmol base, make sure it has been left for a sufficient period of time to cure, is completely dry, and is even. b. Board (calcium silicate board, specific gravity: 1.0)/In the case of structural plywood base... Make sure that the base is firmly fixed and that there are no unevenness in joints, etc. *Recommended thickness: 8mm or more ※point※ When carrying out work in cold seasons, do not carry out work when the temperature is below 5°C or if it is expected that the temperature will drop below 5°C during the curing period after work. 2. Preparation for pasting processing Please adjust the size of the stones to ensure a good fit. Use a diamond cutter, hatchet, pliers, etc. to cut, mill, or separate the material in the areas that are as thin as possible. 3. Applying adhesive Apply MS-20 (adhesive for Can'Stone interior wall imitation stone tiles) to the base using a 6mm toothed trowel. The area you paint at one time should be the area that you can finish applying the stones to within the allotted time. ◎ If the effective bonding area is 70% or less, use an 8mm toothed trowel to increase the amount of MS-20 (adhesive for interior wall imitation stone tiles, Can'Stone) applied to the base, or increase the amount of MS-20 (adhesive for interior wall imitation stone tiles, Can'Stone) applied to the back of the stone. 4. Paste 1. Clean the back of the stone with a brush or similar, then use stone adhesive to attach it. *Please check the application method of the adhesive you are using before installing. 2. If the installation location has corners, start installing from the corner. The corner pieces have long and short sides, so they are attached alternately. 3. When attaching the flat pieces, first work your way up to fitting the larger stones. 5.Curing Allow the mounting adhesive to harden for at least one day in summer, and at least three days in winter, without applying any external pressure. 6. Joint finishing Fill the joints with our joint material MT-MEJI using a joint bag, etc. Fill the joints up to 1/2 the thickness of the stone to the same level, and make sure to fill in any areas that are lacking. To finish the joints, press the filled MT-MEJI firmly with a joint trowel before it hardens, then use a brush or whisk to roughly scratch the joints. ※point※ ◎ Don't worry if the joint trowel leaves uneven marks as you finish the job, and finally use a brush or scissors to scratch the joints in places to make them look weathered. ◎Do not install without joints. ◎Install the joints so that they cover about 1/2 the thickness of the stone to the same level. 7. Maintenance/Cleaning Avoid ventilation and direct sunlight, and protect the stone by covering it with a sheet, etc. Allow the stone to cure for a sufficient period after application, and make sure it is completely dry. Then thoroughly brush off any dust on the stone surface and in the joints. In tile work, we also take care of the joint design (creating nuance). Once completely solidified, please have a cleaning company thoroughly brush away any initial dust from the rough joints. ◎Since CAN'STONE is a secondary cement product, acid washing is strictly prohibited. < Back to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • お問い合わせ | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Inquiry > Contact inquiry To contact us, request a catalog or other materials, or download a web catalog, please enter the required information and press the send button. Request a sample here CONTACT FORM Various inquiries Various inquiries Content of inquiry* Request a catalogue or information Quote/Order Form Inquiries about the product others name* Furigana email address* telephone number* company name Industry please select What prompted your inquiry? (multiple selections possible)* Internet search Instagram Facebook Pinterest RoomClip newspaper magazine Reviews others Remarks/Inquiry details Please check the contents and press the send button below. SEND It may take some time for us to check and reply to your email. If you are in a hurry, please contact us by phone or fax. If you make the same inquiry by phone or fax after submitting the inquiry form, please inform a member of staff to prevent duplication. We apologize for the inconvenience, and thank you for your understanding and cooperation. Once you let us know the quantity and period of use, we will provide you with a quote within 2 business days. Even if you are unsure of the quantity of auxiliary materials (joints, glue, etc.) required for construction, we can also provide you with an estimate. If you have any other questions, please feel free to contact us. Request a sample Check the list

  • キーストーン・アクセサリー 施工方法 | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > キーストーン・アクセサリー 施工方法 > MANUAL Keystone Accessories Installation Method Download PDF > This is a method for installing keystone accessories (wedge stones and cornerstones). Applicable substrate: Concrete block siding board 1. Surface preparation A. In the case of concrete or block base... Inspect the base and dry thoroughly after cleaning. B. In case of siding board base... Make sure the joints are firmly secured and the base is prepared so that it does not move. ※point※ ◎Please avoid rainy weather and carry out the installation on a sunny day. ◎When carrying out construction in cold weather, do not carry out construction when the temperature is below 5°C or when it is expected that the temperature will drop below 5°C during the curing period after construction. 2. Installation of hook screws Check the position of the pin on the back of the keystone accessory, and insert the stainless steel corkscrew screw into the base in the position that will catch on the pin. ※point※ Since keystone accessories are handmade products, the position of the pins will vary from piece to piece, so please check the position before hammering in the screws. 3. Paste Apply adhesive (2-part epoxy resin for exterior use recommended) to the back of the Keystone accessory and attach it. If you hook the pin onto the screw you previously drove in, you can attach it safely until the adhesive hardens. 4.Curing Be sure to allow sufficient time for the adhesive to harden. 5. Painting It is not a problem if keystone accessories are not painted, but if there are color coordination instructions or you are concerned about dirt, please paint them. < Back to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • 404 - ページが見つかりませんでした | キャン'エンタープライゼズ株式会社

    404 Page not found. The page you are looking for cannot be found. お探しのページが見つかりませんでした。 TOP

  • サンプル請求 | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Sample order Sample Request Your desired sample list Currently, we are unable to confirm the sample you have entered due to a system error. We apologize for the inconvenience, but we would appreciate it if you could enter the product number in the sample request notes section. See other products> *Samples of some products, such as props and patterned tiles, are available for a fee (shipping charges are charged separately). *We may not be able to ship samples depending on the type of sample and stock availability. *We are unable to accommodate requests for large quantities of samples, so please refrain from doing so. SEND > お名前 メールアドレス 備考 ふりがな 電話番号 御社名 郵便番号 住所1 住所2 サイトURL 使用予定物件 * 住宅 集合住宅 店舗 商業施設 オフィス その他 使用予定部位 * Required 屋内壁 屋外壁 屋内床 屋外床 その他 案件名 *Please enter as much as possible. 使用予定時期 *Please enter as much as possible. お問い合わせのきっかけ(複数選択可) * Required ネット検索 Instagram FaceBook Pinterest RoomClip 新聞 雑誌 口コミ その他 After checking the contents, Please press the send button below. 請求サンプル ご希望のカタログ カタログを希望 カタログは不要 業種 施主 使用予定数量 It may take some time for us to check and reply to your email. If you are in a hurry, please contact us by phone or fax. If you make the same inquiry by phone or fax after submitting the inquiry form, please inform a member of staff to prevent duplication. We apologize for the inconvenience, and thank you for your understanding and cooperation. Top > Sample Order >

  • Fire Pit-ファイヤーピット(焚き火台)施工方法 | キャン'エンタープライゼズ株式会社

    誰でも簡単施工!ファイヤーピット(焚き火台)の施工方法です。 建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。 Top > Manual > Fire Pit-ファイヤーピット(焚き火台)施工方法 > Download PDF > MANUAL CAN'STONE wire construction method Product details page This is the wire construction manual for the masonry-style wall material "CAN'STONE." ・For installation surfaces up to 3m high, please use regular adhesive. (See the URL below) ・This manual provides recommended installation instructions for wall surfaces with a construction surface height of 3m or more. procedure 1. Tile installation and screw installation Please clean the base surface beforehand. Check that the base is firmly fixed and that there are no unevenness in the joints of the boards, etc. 1-1: Use a spatula or similar tool to apply dots of adhesive to the back of the stone in the form of balls. Alternatively, apply the product until the back of the tile is no longer visible. 1-2: Please attach the film by referring to the installation instructions . Press it firmly until the adhesive comes out. 1-3: Fix the screw in place so that the stainless steel wire can be pulled out about 100 mm from the stone. ※important point※ Please drive the screw into the side where the stainless steel wire is sticking out. (Photo 1) Do not drive the screws all the way in. (Photo 2) 2.排水口の確保 Stainless steel wire processed CAN'STONE 3.インナースチールの仮設置とブロックの一段目配置 Stainless steel wire processed CAN'STONE Stainless steel wire processed CAN'STONE 4.インナースチールの一時移動と残りのブロック配置 Stainless steel wire processed CAN'STONE Stainless steel wire processed CAN'STONE 5.インナースチールの再設置とブロックの微調整 Stainless steel wire processed CAN'STONE 6.砕石の充填と薪の配置 Stainless steel wire processed CAN'STONE < Return to list Product details page CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • 【建材メーカー】レンガ・ブリックタイルのキャン'エンタープライゼズ

    建築用意匠建材メーカー「キャン'エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅外壁、リフォームに。レンガ・ブリックタイル、床タイル、石積調の壁材、擬石タイル、エクステリア商材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Brick Stone Style Tiles Exterior Lights Submaterial Find the COLLECTION Product Information We can make your dreams come true. That is our duty to you. view more SEARCH BY COLOR SEARCH BY ALL Products TOPICS notice View More → RELEASED Catalog Vol.8 (2024) Now accepting orders for the 2024 catalogue Design proposals and construction examples We have published a new, revamped catalogue. Brick tile CAN'BRICK Stone-style wall material CAN'STONE CAN'STYLE: design items for stores and commercial facilities Floor tiles Auxiliary materials etc. Order form CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

  • CAN’STONEワイヤー工法 | キャン'エンタープライゼズ株式会社

    建築用意匠建材メーカー「キャン’エンタープライゼズ」店舗やオフィスの外観から内装、こだわりの住宅に。ブリックタイル、床タイル、石積調の壁材などの製造販売やレンガ、タイル、照明器具の輸入販売。 Top > Manual > CAN’STONEワイヤー工法 > Download PDF > MANUAL CAN'STONE wire construction method This is the wire construction manual for the masonry-style wall material "CAN'STONE." ・For installation surfaces up to 3m high, please use regular adhesive. (See the URL below) ・This manual provides recommended installation instructions for wall surfaces with a construction surface height of 3m or more. The wire method is one of the construction methods used as a safety measure when attaching heavy artificial stone tiles to a wall surface. *This is an explanation page for the wire method (how to fasten stainless steel wire to the base). Please check the construction details in the link below for the prerequisite process. ・CAN'STONE exterior wall construction method (elastic adhesive application method) ・CAN'STONE exterior wall construction method (conventional wet construction method) ・CAN'STONE interior wall construction method (adhesive application method) Tile back surface treatment Stainless steel wire processed CAN'STONE Stainless steel wire is embedded into the back of the tile to physically fasten the wire to the base. Since we will process the product, it will be shipped in the condition shown in the photo. procedure 1. Tile installation and screw installation Please clean the base surface beforehand. Check that the base is firmly fixed and that there are no unevenness in the joints of the boards, etc. 1-1: Use a spatula or similar tool to apply dots of adhesive to the back of the stone in the form of balls. Alternatively, apply the product until the back of the tile is no longer visible. 1-2: Please attach the film by referring to the installation instructions . Press it firmly until the adhesive comes out. 1-3: Fix the screw in place so that the stainless steel wire can be pulled out about 100 mm from the stone. ※important point※ Please drive the screw into the side where the stainless steel wire is sticking out. (Photo 1) Do not drive the screws all the way in. (Photo 2) photo1 Photo 2 2. Wire wrapping 2-1: Wrap the stainless steel wire around the screw. (Photo 3) 2-2: After wrapping, drive the pre-drilled screws all the way in. (Photo 4) Photo 3 Photo 4 < Return to list CONTACT Various inquiries How to design Attention to design Installation Manual Installation Method Contact Samples, catalogue requests and inquiries Request a sample Check the list

bottom of page