This is the wire construction manual for the masonry-style wall material "CAN'STONE."
・For installation surfaces up to 3m high, please use regular adhesive. (See the URL below)
・This manual provides recommended installation instructions for wall surfaces with a construction surface height of 3m or more.
procedure
1. Tile installation and screw installation
Please clean the base surface beforehand. Check that the base is firmly fixed and that there are no unevenness in the joints of the boards, etc.
1-1: Use a spatula or similar tool to apply dots of adhesive to the back of the stone in the form of balls.
Alternatively, apply the product until the back of the tile is no longer visible.
1-2: Please attach the film by referring to the installation instructions . Press it firmly until the adhesive comes out.
1-3: Fix the screw in place so that the stainless steel wire can be pulled out about 100 mm from the stone.
※important point※
Please drive the screw into the side where the stainless steel wire is sticking out. (Photo 1)
Do not drive the screws all the way in. (Photo 2)
3.インナースチールの仮設置とブロックの一段目配置
Stainless steel wire processed CAN'STONE

Stainless steel wire processed CAN'STONE

4.インナースチールの一時移動と残りのブロック配置
Stainless steel wire processed CAN'STONE

Stainless steel wire processed CAN'STONE

5.インナースチールの再設置とブロックの微調整
Stainless steel wire processed CAN'STONE


6.砕石の充填と薪の配置
Stainless steel wire processed CAN'STONE
